Rail | Riverina, NSW
Inland Rail
Cranes, operators and RIW-accredited crews for John Holland and Martinus on the Illabo to Stockinbingal section of Australia's new national freight line.
JH | MARTINUS
Client
WET HIRE
Scope
TO 2028
Timing
The project
A freight line across the country
Inland Rail is a new freight rail line between Melbourne and Brisbane through regional Victoria, New South Wales and Queensland. The Illabo to Stockinbingal section in the Riverina is a new stretch of line that lets freight trains bypass Cootamundra and the steep Bethungra Spiral.
From our Wagga Wagga depot, Superior Cranes supplies cranes on wet hire with our own operators and crews, working inside the project's rail and civil environment every day.
What we do on site
Why rail-ready matters
Rail corridor work runs on access windows and strict site rules. Our crews include Rail Industry Worker accredited operators, riggers and doggers, inducted and ready for corridor work from day one, and our NSW operations are managed by WHS-qualified people who know the paperwork as well as the lifting.
The job done right, done safely and done on time.
Project facts
Inland Rail I2S
ClientJohn Holland | Martinus
ScopeMobile crane wet hire
SectorRail
LocationIllabo to Stockinbingal, NSW
DepotWagga Wagga
TimingTo 2028
On the line
Rail lifts

Rolling stock lift

Locomotive lift

Machinery beside the line

Franna at a rail siding
How we work
Rail-ready by default
RIW accredited
Operators, riggers and doggers with active Rail Industry Worker accreditation.
Paperwork first
Lift plans, SWMS, rescue plans and permits ready before the possession starts.
Inside the window
Crews rostered around access windows, nights and weekends.
Engineered lifts
CAD lift studies by our own lift engineer for every critical lift.
More projects
Other major work
HumeLink West
UGL CPB JV | Mobile crane wet hire
To 2028
Riverina Redevelopment
Downer CPB JV (RRJV) | Mobile crane wet hire
To 2035
Lake Cowal Gold Mine
Evolution Mining | Shutdowns and primary wet hire
Ongoing
Brisbane Metro
Acciona | Advanced Deconstruction | Super-T bridge demolition
Delivered
Let’s talk about your next project
Ready to lift 24/7
Brisbane | QLD
(07) 3184 0978
324 New Cleveland Rd, Tingalpa QLD 4173
Wagga Wagga | NSW
(02) 6925 2556
35-39 Copland St, Kooringal NSW 2650
